Aiming to protect El-Hamra Oil Field, located in Alamien; ECG will work on the engineering design for fire alarm and firefighting systems.
The Project comprises the following:
10 Storage tanks
· 1 tank; 100,000 bbl
· 4 tanks; 30,000 bbl
· 1 tank; 10,000 bbl
· 4 tanks; 9,000 bbl
Process area consist of
· 4 Oil Separators
· 1 Heater Unit
· Power Station
· Warehouse/Stores
· Kitchen
· Administration Building
· Accommodation Buildings
· Workshops
· Mess Hall
· Production facilities at; north east Alamien field (each 1000 bbl crude oil tank).
ECG scope covers, detailed design and basis of report.
date
Apr 13, 2017