Al-Galala Resort District Cooling Plant

Project Description

This project was undertaken by a consortium comprising ECG Engineering Consultants Group, Misr Engineering Development Company (MEDCOM), and ECM Energy Services.
The district cooling plant consists of a ground floor and a mezzanine, with a total built-up area of about 3,500 m2.
The plant, operated using chilled water, has a total cooling capacity of 16,866 kW (4,800 TR).
It includes the following components:

  • double-height chiller yard complete with chillers, pumps, piping, and connections
  • administration area that includes offices, meeting room, toilets, storage area, and other services
  • electrical rooms with low-voltage and medium-voltage generators

The plant has four centrifugal, water-cooled, parallel counterflow chillers, as well as HFC-134a refrigerants. The chillers utilize the vapor-compression cycle, and each chiller has a capacity of 2 × 5,622 kW (2 × 1,600 TR) at a
constant speed, and a capacity of 2 × 2,811 kW (2 × 800 TR) at a variable speed.
District Cooling System

  • Chilled water design temperature: 8.9 C°
  • Chilled water supply/return: 4.4 C/13.3 C° Pumping
  • Primary chilled water pumps: 4
  • Secondary pumps: 4

Drive: variable speed

  • Condensation pumps: 4
  • Pump type: horizontal split case Cooling Towers
  • Position: atop the plant
  • Cooling towers: 4
  • Cells per cooling tower: two towers have two cells each, and two towers have one cell each
  • Cooling tower temperature: 5.6 C°
  • Cooling tower design temperature (in/out): 35.0 C°/29.4 C°

Activities

  • Architectural
  • Civil Works
  • Communications and security systems
  • Electrical
  • HVAC
  • Infrastructure
  • Landscaping
  • Mechanical
  • Structural

Scope

  • Shop drawings

Client