Project Description
The project is divided into three zones (Zone 1, 2, & 3): Zone 1 includes Abdullah Al-Ahmed Street (5 Phases) with a total length of 5.5 km and width of 65 m, Zone 2 includes Dasman Roundabout (5 Phases) with a total length of 350 m and width of 16 m, and Zone 3 includes Bneid Al-Gar Junction (3 Phases) with a total length of 0.80 km and width of 31 m. This adds to a trough with a length of 1.5 km and width of 35 m.
Scope of work covers a stormwater network in the trough with a total length of 6.7 km, shoring, dewatering, and bridges’ connections (5 cross bridges over Dasman trough with a length of 40 m and width of 35 m), in addition to base slab and tension piles.
Activities
- Infrastructure
- Structural
Scope
- Design review
- Design validation
Client
Al-Kharafi Construction Co. W.L.L. (MAK Group)
LOCATION
kuwait