Project Description
Construction of two 6 MIG reinforced concrete rectangular water reservoirs, including all necessary instruments, piping, electrical, landscaping, and sewer works, in addition to VFD pumps in the existing pump house, standby pump house for existing tanker filling station, and new chlorination building.
Potable Water Pipes
- 1 km, 600 mm dia. DI pipeline
- 9 km, 900 mm dia. DI pipeline
Capacity of Potable Water Pumping Station: 43,200 m3/day
Capacity of Potable Water Reservoirs: 12 MIG (2 x 6 MIG)
Capacity of Water Outlet:
- 2 Duty Mains: 250 l/s
- Total Flow Rate: 500 l/s
Activities
- Architectural
- Civil Works
- Communications and security systems
- Electrical
- HVAC
- Instrumentation and control
- Landscaping
- Mechanical
- Roads
- Structural
Scope
- Detailed design
Client
Al Jaber Engineering L.L.C
LOCATION
qatar