Aircraft Washing Yard at Cairo International Airport – Terminal Building 3

Project Description

The construction of an Aircraft Washing Yard located at the west of Cairo International Airport TB3 Apron Area. The facility will serve two code E aircrafts at the same time. The project comprises open yard of 15,000 m2 of concrete rigid pavement, lighting towers around the open yard, water tank, pump station including pump set including diaphragm tank, water supply network covering the open yard including four outlets for each aircraft in an underground concrete trench, spraying equipment, trolley hose reels, drainage system, earthing system and shed for the pump station.

The project was inaugurated in 2010 due to the successful collaboration between ECG, Japan Airport Consultants and Netherlands Airport Consultants B.V.
 

Activities

  • Architectural
  • Civil (water supply, wastewater, storm water drainage, & irrigation system)
  • Communications and security systems
  • Electrical
  • Fire protection
  • HVAC
  • Mechanical
  • Structural

Scope

  • Conceptual design
  • Construction management
  • Construction supervision
  • Detailed design
  • Geotechnical investigations
  • Master plan
  • Tender Action
  • Tender documents

Client

Egypt Air