Project Description
Owned by the Egyptian Electricity Authority (EEA), the objective of the project was to upgrade the existing power station at Damanhour through the utilization of waste heat discharged to the atmosphere by gas turbines. The exhaust gases from the gas turbines were to be diverted through non-fired heat recovery boilers (HRSG) for the generation of steam. The generated steam produced an additional electrical power of 1×50 MW.
The project involved the addition of four heat recovery boilers to integrate four existing GE frame 5 Gas Turbines, into combined cycle mode of operation. This enabled the powering of 1×50 MW Turbo-Alternators.
The heat recovery boilers were to be arranged to produce superheated steam by extracting heat from the exhaust gases of the gas turbines. This superheated steam was to be used to drive a steam turbine generator. The heat recovery boilers were fitted to the gas turbines on a one- for-one basis. The superheated steam produced by four boilers was delivered to one main steam manifold which was connected to steam turbine generator of 50 MW steam driven nominal capacity.
The total plant consisting of heat recovery boilers, steam turbine generators and auxiliaries; was controlled and operated by a central control room. The plant also included: additional tank farms; cooling water systems fed by irrigation canals connected to the River Nile; electrical control and instrumentation systems; and civil/ structural works.
The project was implemented in four packages, namely:
- Heat Recovery Boiler Package, including: boilers and related structural steel, foundation works and associated facilities; pipe works; electrical cables and panels; instrumentation and control equipment; and some gas turbine modifications.
- Steam Turbine Package, including: steam turbines; alternators with necessary accessories; condensing plant and auxiliaries; main cooling water system; water treatment plant; fire protection system; compressed air system; cranes, hoists and handling equipment; electrical equipment; control and instrumentation equipment; and laboratory equipment.
- Electrical Power Package, including: circuit breakers; transformers; power boards; battery and charger systems; and associated cabling.
- Civil Works Package, including: turbine/control/ administration building, water treatment building and maintenance building (total area was 1,000 m2) piled foundations for heat recovery boilers construction; cooling water system (intake structure, pumping station, inlet and outlet culverts, and outfall structure); external works e.g. roads, cable ducts, fencing and gates.
Activities
- Civil Works
- Communications and security systems
- Fire protection
- HVAC
- Instrumentation
- Mechanical
- Structural
Scope
- Construction management
- Construction supervision
- Contract administration
- Design review
- Geotechnical investigations
- Quality control
- Quality control (Construction supervision)
Client
ESB International, Ireland and Gilbert/ Commonwealth International Inc., USA Joint Venture (ESBI/GCII)
LOCATION
egypt
,project sheet
share this project