Project Description
Two KAHRAMAA transmission mains from the 60 MIGD Independent Power and Water Producer (IPWP) facility at Umm Al Houl as follows:
- 15 km 1,600 mm dia. to Mesaieed Industrial City (MIC)
- 1,200 km 600 mm dia. to Al Wakra Industrial Area
The scope of works includes:
- Hydraulic study for the entire water pipework, pumping station, and reservoir systems
- Surge and transient analysis for the complete piping system
- Solution for reversing flow through the existing 1,200 mm dia. pipeline
- Two fibre optic cables for Afjat Muaither and Mekaines Reservoir Pumping Stations (RPSs)
- Chambers and interconnections
- 1,200 mm dia. interconnection pipeline adjacent to Mesaieed Town secondary reservoir pumping station
- Modifications and expansion of the existing monitoring and control equipment, facilities, and accessories in the pump station (PRPS-5) and incorporating new valves, flowmeters, piping, and instrumentation in the station control and monitoring system
- Power supply to new valves and control and measurement instruments from the existing panels
- 900 mm dia. interconnection pipeline on Dukhan Road, between the existing 900 mm dia. pipelines, including chambers and interconnections
- 600 mm dia. interconnection pipeline at Ras Bu Funtas, between the existing 600 mm dia. pipelines, including chambers and interconnections
- 2 km pipelines 300 mm /400 mm/ 600 mm dia. at Lebsayyer
Activities
- Civil Works
- Communications and security systems
- Electrical
- Instrumentation and control
- Mechanical
- Structural
Scope
- Detailed design
- Issued for construction
Client
Boom Construction Company W.L.L.
LOCATION
qatar
,project sheet
share this project